
Napocor needs P11.5B to avert brownouts
‘For 2025, we need P11.5 billion to be approved. Otherwise, each billion of the deficit would result in about 2.1 hours of no power.’
· 1 MIN READ
Topic

‘For 2025, we need P11.5 billion to be approved. Otherwise, each billion of the deficit would result in about 2.1 hours of no power.’
· 1 MIN READ

Asset purchase alone was somewhere between P700 million to a billion to purchase the assets and then we would still need to do a technical due diligence to see…
· 2 MIN READ

There were no employees displaced following the abolition of over 800 permanent positions amid the recent privatization of the Ninoy Aquino International…
· 1 MIN READ

A letter has already been sent to the DOE, explaining that insufficient funding will force Small Power Utilities Group plants to scale down operations, leading…
· 1 MIN READ

The MoU aims to fast-track discussions with mobile network operators and secure their approval for the deployment and subleasing of common towers in the…
· 2 MIN READ

The New NAIA Infrastructure Corp. (NNIC), the operator of Ninoy Aquino International Airport (NAIA), has implemented a new policy to handle courtesy and…
· 1 MIN READ

The upgrade reconfigured the substation’s in-out system, significantly reducing the risk of outages in Iloilo City, particularly during peak hours
· 1 MIN READ

Manila Water Company Inc. (MWC) is joining the growing list of local companies shifting to renewable energy with plans to install solar power systems across…
· 1 MIN READ

The Manila International Airport Authority (MIAA) on Tuesday disclosed that it is already looking forward to carrying out its duties as the regulator for the…
· 2 MIN READ
Quezon Province led throughout and trounced Negros, 73-60, in the opener of their South Division quarterfinal playoffs in the Maharlika Pilipinas Basketball…
· 2 MIN READ

Our recent partnerships with AP Renewables Inc. and CEMEX Philippines demonstrate our commitment to execution excellence
· 1 MIN READ

In the mountainous terrains of Quezon, a 1st class municipality in Bukidnon, education has long been an uphill battle. For children in off-grid areas like…
· 2 MIN READ

Only the top four teams after a two-round eliminations will advance to the playoffs of this event also organized by the Volleyball Masters of the Philippines.
· 1 MIN READ

Barrameda noted that the lack of subsidy settlements from NPC had caused operational difficulties, forcing the company to make this decision.
· 1 MIN READ

‘If we can get a total of $25 billion, that’s better. We should aspire for that.’
· 2 MIN READ

MANILA, PHILIPPINES – Eaton, an intelligent power management company, has appointed VSTECS Phils., Inc. as the authorized distributor of its uninterruptible…
· 2 MIN READ

At Friday's inauguration of the P8.3-billion Panguil Bay Bridge project, which connects Tangub City in Misamis Occidental and Tubod Municipality in Lanao del…
· 1 MIN READ

Fresh from putting the Philippines in the global occupational safety map by winning an ASEAN Occupational Safety and Health Network Excellence Award, the SN…
· 1 MIN READ