
BBM: 2027 NEP to have flood control funds
President Ferdinand “Bongbong” Marcos Jr. on Monday said the stalled infrastructure projects will be included in the National Expenditure Program (NEP) for…
· 2 MIN READ
Topic

President Ferdinand “Bongbong” Marcos Jr. on Monday said the stalled infrastructure projects will be included in the National Expenditure Program (NEP) for…
· 2 MIN READ

Former Department of Public Works and Highways (DPWH) District Engineer Henry Alcantara testified before the Sandiganbayan that former senator Ramon “Bong”…
· 2 MIN READ

The Henry Sy Sr. Hall at SFHS is the 117th school building built by SM Prime Holdings across the country under the DepEd’s Adopt-a-School program.
· 2 MIN READ

Licensed gaming operator Casino Plus is backing recovery efforts in earthquake-hit Mindanao with more than P3 million in aid and rebuilding support, as its…
· 2 MIN READ

The Cebu Provincial Government is set to establish two strategically located disaster storage hubs in Danao City and Sibonga town to strengthen disaster…
· 1 MIN READ

TACLOBAN CITY — The mighty Catubig River, one of the largest river systems in Northern Samar, has long been both a blessing and a challenge for residents of…
· 2 MIN READ

The Securities and Exchange Commission (SEC) has cleared the rental pool program of DMCI Project Developers Inc., paving the way for the sale of 2,138…
· 2 MIN READ

The Securities and Exchange Commission (SEC) has cleared the rental pool program of DMCI Project Developers, Inc., paving the way for the sale of 2,138…
· 2 MIN READ

Without congressional authorization on the funds, even fully disbursed foreign loans sit inert.e
· 2 MIN READ

Two women were arrested on 14 June after allegedly posing as senior officials of the Department of Public Works and Highways (DPWH) and using falsified…
· 2 MIN READ

Nosy Tarsee is hearing curious things about a certain Batangueño solon known for keeping a road project in the family, so to speak.
· 2 MIN READ

Independent directors of First Gen Corporation have reaffirmed their support for the company's recent P75-billion hydropower investments amid escalating…
· 2 MIN READ

A senator and his father have reportedly been sweating over reports that plunder charges linked to flood control projects in their home province could soon…
· 2 MIN READ

Two women were arrested by authorities on 14 June after allegedly posing as senior officials of the Department of Public Works and Highways (DPWH) and using…
· 2 MIN READ

Public Works Secretary Vince Dizon and Dagupan City Mayor Belen Fernandez inspected the now-viral section of Arzadon Road in Barangay Mayombo, where ongoing…
· 1 MIN READ

PALO, Leyte — The Department of Public Works and Highways (DPWH) has begun feasibility studies for a proposed P1.72-billion parallel bridge to the Biliran…
· 1 MIN READ

Consumption and services alone cannot sustain long-term economic development. A nation grows not merely by spending but by building.
· 4 MIN READ

ACMobility and ACEN RES have partnered to offer businesses a package that combines electric vehicle charging stations with electricity supply from renewable…
· 2 MIN READ

