
Topic


The Office of the Ombudsman has moved to drop plunder and graft charges against former Department of Public Works and Highways (DPWH) Secretary Manuel Bonoan…
· 5 MIN READ

Subic Bay Freeport – To boost connectivity between 47 government agencies for faster communication, the Department of Information and Communications Technology…
· 2 MIN READ

Three flood control pumps at the Sunog-Apog pumping station in Tondo, Manila are now fully operational following a major repair, Department of Public Works and…
· 1 MIN READ

‘Our encouragement is to fund and start these anomaly-free constructions so the country can move forward.’
· 3 MIN READ

From irrigation to floodwaters to students’ safety, President Ferdinand Marcos Jr.’s week centered on ensuring that all government projects were up and running.
· 4 MIN READ
BAGUIO CITY — Residents and visitors of Baguio City will have to wait longer for relief from recurring water shortages after the city’s flagship rainwater…
· 2 MIN READ

This is a tale of two artists who use walls as their canvas.
· 1 MIN READ

Maharlika’s fuel tank farm buys the country time while energy transition — the one that would materially reduce the country’s 97-percent crude import…
· 3 MIN READ

Alternergy Holdings Corp. (ALTER) has sold a 40 percent stake in its Tanay and Alabat wind projects to ABC Energy Inc. for P2.4 billion, providing fresh…
· 2 MIN READ

President Ferdinand Marcos Jr. has directed the Department of Transportation (DOTr) to immediately resolve the right-of-way issues delaying the P64.19-billion…
· 2 MIN READ

Extortion and cumbersome bureaucratic processes (red tape) increase the cost of doing business, discouraging both local and foreign investments.
· 2 MIN READ

PANIITIAN, Sofronio Española, Palawan — A flashflood submerged the Panitian Elementary School here on Monday as the southwest monsoon brought heavy rains,…
· 2 MIN READ

TABUK CITY, Kalinga — An anti-corruption watchdog is demanding a comprehensive site inspection of the P125-million Makilo Bridge Replacement Project before its…
· 1 MIN READ

The Philippines is set to attract around P80 million in annual investments for a landmark nature restoration project that will rehabilitate 120,000 hectares of…
· 4 MIN READ

The Sandiganbayan Sixth Division has denied the motion for reconsideration filed by several former Department of Public Works and Highways (DPWH)-MIMAROPA…
· 2 MIN READ

A former employee of the Department of Public Works and Highways (DPWH) testified before the Sandiganbayan that he had conducted numerous deliveries of boxes…
· 2 MIN READ

President Ferdinand Marcos Jr. on Monday launched a major irrigation project in Bohol aimed at protecting farmlands — particularly rice-producing areas — from…
· 1 MIN READ

