Wednesday, 2 September 2026
Nasdaq -1.03%
Subscribe NowSupport Us

Daily Tribune

Daily Tribune
Subscribe
Wednesday, 2 September 2026
  • News
  • Opinion
  • Business
  • Life
  • Show
  • Sports
  • Global Goals
  • Obituary
Partner feature

The Philippines' leading digital newspaper.

News
  • Headlines
  • Page three
  • Metro
  • Nation
  • World
  • Dyaryo Tirada
  • SONATOTOO (archive)
Opinion
  • All columnists
  • Editorials
  • Guest essays
  • Letters to the Editor
  • Scuttlebutt
Business
  • Shipping
  • Portraits
  • Pep
  • Business Advisories
  • Technology (Tech Talks)
Life
  • Show
  • Food & Drink
  • Getaways
  • Arts & Culture
  • Social Set
  • Spaces
  • Fashion & Beauty
  • The Edit
  • Top Form
  • Next Gen
  • Sacred Space
  • Project Larawan
  • Snaps
Sports
  • Hoops
  • Volley
  • Golf
  • Goal
  • Boxing
  • Tennis
  • Esports
  • Blast

Company

  • SONATOTOO archive
  • About
  • Contact
  • Advertise
  • Privacy
  • Subscribe
  • Support Us

© 2026 Daily Tribune · tribune.net.ph · Powered by Quintype

NATION

DPWH orders contractor to repair damaged Aringay flood control project

Jasper Dawang·13 August 2026, 3:53 am·1 MIN READ

DPWH orders contractor to repair damaged Aringay flood control project
Text size

Share

Partner feature

Stay informed

Get Daily Tribune in your inbox

Breaking news, opinion, and business coverage for readers in the Philippines and abroad.

Subscribe to the newsletter

Read next

Remulla calls for unity, ‘zero politicking’ in flood-control projects

Remulla calls for unity, ‘zero politicking’ in flood-control projects

What's your take?

Share

Google Preferred Sources

Get more Daily Tribune stories in your search results

Add Daily Tribune as a preferred source on Google Search.

Add to Google

Continue reading

  • NIA chief assures safety of aging dams, eyes multipurpose projects for flood control
    NIA chief assures safety of aging dams, eyes multipurpose projects for flood control
  • PRA probes unauthorized Laguna de Bay infra projects
    PRA probes unauthorized Laguna de Bay infra projects
  • Two dead, one missing after Grand Canyon flash flood
    Two dead, one missing after Grand Canyon flash flood
Partner feature
Partner feature
Partner feature

Suggested Articles

DPWH eyes major Central Luzon detention basins
NATION

DPWH eyes major Central Luzon detention basins

President Ferdinand Marcos Jr. has ordered the Department of Public Works and Highways (DPWH) to prioritize…

Jeffrey G. Damicog·11 hours ago

Castro pours cold water on Dizon’s toll holiday
NEWS

Castro pours cold water on Dizon’s toll holiday

Malacañang told motorists to stay away from the North Luzon Expressway (NLEX) as flooding and gridlock persisted —…

Raffy Ayeng·11 hours ago

Senate defunds new flood projects
NEWS

Senate defunds new flood projects

The Senate Finance Committee will again adopt a zero-funding policy for new flood control projects in the 2027 budget,…

Edjen Oliquino·11 hours ago

Recto: ‘I know nothing’ of bbm link to scam
NEWS

Recto: ‘I know nothing’ of bbm link to scam

Executive Secretary Ralph Recto said Tuesday he had “no personal knowledge” of the allegations linking President…

Jerod Orcullo·11 hours ago

Vice Ganda snubs Heart Evangelista
HEADLINES

Vice Ganda snubs Heart Evangelista

It was obvious that Vice Ganda purposely snubbed Heart Evangelista during the recent concert of Yeng Constantino. They…

Alex Brosas·11 hours ago

  • The Department of Public Works and Highways (DPWH) has ordered JWU Construction and Supply to repair portions of a flood control project in Barangay San Juan East, Aringay, La Union, after the structure was damaged during recent severe weather.

    The order covers Project No. 25AF0051, or the construction of flood control structures along the Aringay River Basin. In a Notice of Defects dated Aug. 4, 2026, the DPWH La Union 2nd District Engineering Office said about 107 meters of the structure across three sections had been damaged, which it attributed to Tropical Depression “Luis.”

    Because the project remains under warranty, DPWH invoked the applicable contract provisions and directed the contractor to undertake repairs at its own expense. JWU was also ordered to conduct a joint inspection with the district office and submit a repair methodology and schedule.

    JWU, in a letter dated 7 August, disputed responsibility, saying the damage was caused by force majeure due to successive typhoons and six days of heavy rainfall that increased river discharge and water velocity beyond conditions reasonably anticipated in the project's design.

    The contractor denied that the damage resulted from poor workmanship, defective materials or negligence, but said it remained willing to join the inspection and assist with repairs pending a determination of responsibility.

    A DPWH post-calamity assessment identified the damaged component as stone masonry works and cited Tropical Depression “Luis” and “Maymay” in connection with the incident. The district office also reported damage to other flood control structures caused by prolonged rainfall, strong river currents and debris.

    The documents do not establish a final technical finding on the cause of the damage. Responsibility will depend on the joint inspection, technical findings and applicable contractual provisions.

    Also read

    PBBM-directed DPWH reforms show results — Salceda
    NATION

    PBBM-directed DPWH reforms show results — Salceda

    Presidential Legislative Officer and Secretary Joey Sarte Salceda said infrastructure reforms directed by President Ferdinand R. Marcos Jr.…

    Raffy Ayeng·9 August 2026

    Also read

    DPWH conducts Ilocos Norte project inspection
    NATION

    DPWH conducts Ilocos Norte project inspection

    Department of Public Works and Highways (DPWH) Secretary Vince Dizon conducted a series of project inspections in Ilocos Norte on Friday,…

    Jasper Dawang·8 August 2026

    • DPWH
    • flood control project
    • aringay