Skip to content

Topic

EDSA mall connectivity

Latest Daily Tribune news and analysis on EDSA mall connectivity.

  1. DPWH resumes EDSA Phase 2 reblocking

    DPWH resumes EDSA Phase 2 reblocking

    The DPWH has resumed the second phase of EDSA rehabilitation, with asphalt overlay and concrete reblocking scheduled through 8 November along sections near…

  2. EDSA Busway remains bus-only

    EDSA Busway remains bus-only

    The temporary arrangement is intended to maintain the traffic flow while road reblocking works are carried out.

  3. Over 300 EDSA buses face retrofit deadline

    Over 300 EDSA buses face retrofit deadline

    Over 300 EDSA Busway buses must retrofit left-side doors within six months or face penalties, as the government enforces stricter safety measures to protect…

  4. Department of Transportation (DOTr) logo

    DoTr to link SM North, Trinoma via walkway

    The DoTr will build a covered walkway connecting SM North EDSA and Trinoma to protect pedestrians from flooding and harsh weather, with future integration to…