Thursday, 13 August 2026
Nasdaq +0.54%
Subscribe NowSupport Us

Daily Tribune

Daily Tribune
Subscribe
Thursday, 13 August 2026
  • News
  • Opinion
  • Business
  • Life
  • Show
  • Sports
  • Global Goals
Partner feature

The Philippines' leading digital newspaper.

News
  • Headlines
  • Page three
  • Metro
  • Nation
  • World
  • Dyaryo Tirada
  • Obituary (Remember Me)
  • SONATOTOO (archive)
Opinion
  • All columnists
  • Editorials
  • Guest essays
  • Letters to the Editor
  • Scuttlebutt
Business
  • Shipping
  • Portraits
  • Pep
  • Business Advisories
  • Technology (Tech Talks)
Life
  • Show
  • Food & Drink
  • Getaways
  • Arts & Culture
  • Social Set
  • Spaces
  • Fashion & Beauty
  • The Edit
  • Top Form
  • Next Gen
  • Sacred Space
  • Project Larawan
  • Snaps
Sports
  • Hoops
  • Volley
  • Golf
  • Goal
  • Boxing
  • Tennis
  • Esports
  • Blast

Company

  • SONATOTOO archive
  • About
  • Contact
  • Advertise
  • Privacy
  • Subscribe
  • Support Us

© 2026 Daily Tribune · tribune.net.ph · Powered by Quintype

NATION

P5-M Marilao river wall collapses

Jonas Reyes·13 August 2026, 2:43 am·1 MIN READ

RESIDENTS observe the damage to a P5-million river wall in Barangay Prenza II, Marilao, Bulacan, on Wednesday, a day after heavy rains from the enhanced southwest monsoon caused it to collapse.

RESIDENTS observe the damage to a P5-million river wall in Barangay Prenza II, Marilao, Bulacan, on Wednesday, a day after heavy rains from the enhanced southwest monsoon caused it to collapse.

PHOTOGRAPH BY ANALY LABOR FOR DAILY TRIBUNE

Text size

Share

Partner feature

Stay informed

Get Daily Tribune in your inbox

Breaking news, opinion, and business coverage for readers in the Philippines and abroad.

Subscribe to the newsletter

Read next

Pampanga declares state of calamity

Pampanga declares state of calamity

What's your take?

Share

Google Preferred Sources

Get more Daily Tribune stories in your search results

Add Daily Tribune as a preferred source on Google Search.

Add to Google

Continue reading

  • Marikina lauds MMDA over swift response
    Marikina lauds MMDA over swift response
  • Flood-prone Tunasan sees infrastructure improvements
    Flood-prone Tunasan sees infrastructure improvements
  • Antiquated responses
    Antiquated responses
Partner feature
Partner feature
Partner feature

Suggested Articles

The Philippines failed Bongbong
EDITORIAL

The Philippines failed Bongbong

Because world-class flood control requires world-class citizens. Everyone disciplined. Nobody litters. Nobody throws…

DT·4 hours ago

P5-M Marilao river wall collapses 2 months after completion
NATION

P5-M Marilao river wall collapses 2 months after completion

A P5-million river wall in Barangay Prenza 2, Marilao, Bulacan, collapsed on Monday, just two months after its…

Jonas Reyes·11 hours ago

Frustrated university students demand accountability
NATION

Frustrated university students demand accountability

BACOLOR, Pampanga — Stranded in flooded dormitories with classes suspended, freshmen at Pampanga State University…

Franco Regala,Jonas Reyes·11 August 2026

Marikina flood-free as residents return home
METRO

Marikina flood-free as residents return home

The local government of Marikina City announced Tuesday that floodwaters have fully receded across the city, allowing…

Neil Alcober·11 August 2026

Pasig river ferry service resumes after six-day suspension
METRO

Pasig river ferry service resumes after six-day suspension

The Metropolitan Manila Development Authority (MMDA) said on Tuesday that the Pasig River Ferry Service had resumed…

Lisa Marie Apacible·11 August 2026

    • Marilao river wall collapse
    • Bulacan flooding
    • River wall investigation

    A P5-million river wall in Barangay Prenza 2 collapsed last 10 August following heavy rainfall brought by the enhanced southwest monsoon, just two months after its completion.

    The 45-meter-long, 12-meter-high structure collapsed around 5 p.m., prompting criticism from residents and local social media users who questioned the quality of materials and construction, suspecting the structure was unable to withstand strong flood currents.

    Contractor JB Construction denied allegations of cutting corners, stating the project strictly adhered to engineering plans, steel specifications and concrete thickness.

    The company attributed the structural failure to extreme hydrostatic pressure caused by water-saturated soil pushing against the wall.

    Marilao Mayor Jamina Sy officially launched an investigation into the collapse and inspected the damaged site alongside municipal officials on Wednesday.

    “We visited the damaged riprap at Beverly 1, Barangay Prenza 2, to assess the damage caused by the southwest monsoon. We will ensure the contractor rebuilds it at no additional cost to the local government. We will continue to monitor its repair for the safety of our residents,” Sy said, assuring residents that the contractor will rebuild the structure at no additional cost to the municipal government.

    Meanwhile, local officials in neighboring barangays reported widening gaps and leaning dikes along other river walls in the municipality, raising further safety concerns among residents.

    Also read

    P5-M Marilao river wall collapses 2 months after completion
    NATION

    P5-M Marilao river wall collapses 2 months after completion

    A P5-million river wall in Barangay Prenza 2, Marilao, Bulacan, collapsed on Monday, just two months after its completion, prompting the…

    Jonas Reyes·11 hours ago

    Also read

    P5-M RIVER WALL COLLAPSES
    Photos

    P5-M RIVER WALL COLLAPSES

    Analy Labor·11 hours ago