
Tip: add a year in your query (e.g. Eala 2022) or use the year filter.
45,863 results for “flood control ghost projects”


The Senate Blue Ribbon Committee will resume its probe into alleged multi-billion-peso "ghost" flood control projects in Taguig City following the upcoming SONA


Senator Joel Villanueva filed a counter-affidavit denying involvement in alleged ghost flood control projects, DOJ confirms ahead of preliminary investigation.


Mga dokumento ng DPWH ang nagpapakita na umiiral at halos tapos na ang P96.5M flood control project sa Davao Occidental at ihahain sa korte para sa pagsusuri.

The P96.5 million flood control project in Culaman is nearly finished despite previous graft allegations against DPWH officials and the contractor.

The Office of the Ombudsman has found probable cause to file graft and malversation charges over an alleged P96.5-million flood control ghost project in Davao…

Sen. Ping Lacson warns that up to P180 billion may have been lost to ghost flood control projects since 2016, as the Senate rolls out transparency reforms and…


The Armed Forces of the Philippines identified 252 ghost flood control projects after inspecting 10,000 sites nationwide, as part of a joint AFP–PNP review…

Former Rep. Christopher de Venecia denies allegations of “ghost” flood control projects, calls complaint baseless and vows to present evidence before…


The ICI has asked the Ombudsman to investigate DPWH officials over a P95M flood control project in Bulacan that COA inspectors say was paid for but never built.

The AFP discovered about 60 ghost flood-control projects during field inspections and is assisting the DPWH with verification and technical support nationwide.

The Independent Commission for Infrastructure (ICI) will file at least 15 criminal cases before the Ombudsman after uncovering 421 suspected “ghost” flood…

CoA listed projects of SYMS Construction Trading, Topnotch Catalyst Builders, Inc., Triple 8 Construction and Supply Inc., in the district and dubbed by the…

Baguio City refutes claims of a ‘ghost’ flood control project, releasing photos and documents to prove the creek project was completed in June 2025.
