
Marcoleta slams 'sleeping' River Basin Office amid flood control hearing
During a Senate Blue Ribbon Committee hearing on flood control projects, Senator Rodante Marcoleta questioned the role and visibility of the River Basin…
· 1 MIN READ
Topic

During a Senate Blue Ribbon Committee hearing on flood control projects, Senator Rodante Marcoleta questioned the role and visibility of the River Basin…
· 1 MIN READ

Baricuatro’s statement underscores her determination to ensure that flood control funds are properly managed and that those responsible for mismanagement or…
· 2 MIN READ

‘ Any development that goes beyond the allowable limits not only breaches regulatory requirements but also risks causing damage to the environment.’
· 1 MIN READ
Embattled PH Resorts Holdings Group Inc., led by Davao City-based trader Dennis Uy, who is also behind the stalled Emerald Bay casino project in Mactan, Cebu,…
· 2 MIN READ

A thinly capitalized contractor that was one of the 15 firms President Ferdinand Marcos Jr. identified as cornering P100 billion worth of projects within three…
· 3 MIN READ

President Ferdinand Marcos Jr. visited Ormoc City on Monday to inspect a Solar Pump Irrigation Project (SPIP) of the National Irrigation Administration (NIA)…
· 1 MIN READ

‘Things were done cheaply and not completed.’
· 3 MIN READ

The ampaw project in Calumpit, Bulacan in which the substandard structure was not hidden from President Marcos was just the tip of the iceberg.
· 2 MIN READ

Bulacan Governor Daniel Fernando announced Sunday that he will issue an executive order requiring all flood control projects in the province to be reviewed and…
· 1 MIN READ

The Senate Blue Ribbon Committee is set to open a formal investigation into alleged irregularities in multi-billion-peso flood control projects this week.
· 2 MIN READ

Domestic terminal fees will rise from P200 to P390, while international terminal fees will increase from P550 to P950.
· 2 MIN READ

The uncomfortable truth laid bare by this necessary infrastructure is that even the mightiest pumps are rendered impotent by the smallest acts of citizen…
· 3 MIN READ

The Department of Transportation (DoTr) is aiming to complete the P89.1-million Kamuning Footbridge and EDSA Busway Station rehabilitation by December.
· 1 MIN READ

Some projects were suspended due to pending environmental clearances and permits.
· 1 MIN READ

Despite the billions of pesos apparently lost to corruption, Malacañang said the 15 contractors will not be blacklisted until the investigation is completed.
· 3 MIN READ

Department of Public Works and Highways records showed that EGB Construction Corp. completed and turned over the P39.82-million flood-control project along the…
· 2 MIN READ
The Department of Public Works and Highways (DPWH) said it is verifying possible anomalies involving 15 contractors flagged by President Ferdinand R. Marcos Jr.
· 2 MIN READ

