Saturday, 15 August 2026
Nasdaq -0.38%
Subscribe NowSupport Us

Daily Tribune

Daily Tribune
Subscribe
Saturday, 15 August 2026
  • News
  • Opinion
  • Business
  • Life
  • Show
  • Sports
  • Global Goals
Partner feature

The Philippines' leading digital newspaper.

News
  • Headlines
  • Page three
  • Metro
  • Nation
  • World
  • Dyaryo Tirada
  • Obituary (Remember Me)
  • SONATOTOO (archive)
Opinion
  • All columnists
  • Editorials
  • Guest essays
  • Letters to the Editor
  • Scuttlebutt
Business
  • Shipping
  • Portraits
  • Pep
  • Business Advisories
  • Technology (Tech Talks)
Life
  • Show
  • Food & Drink
  • Getaways
  • Arts & Culture
  • Social Set
  • Spaces
  • Fashion & Beauty
  • The Edit
  • Top Form
  • Next Gen
  • Sacred Space
  • Project Larawan
  • Snaps
Sports
  • Hoops
  • Volley
  • Golf
  • Goal
  • Boxing
  • Tennis
  • Esports
  • Blast

Company

  • SONATOTOO archive
  • About
  • Contact
  • Advertise
  • Privacy
  • Subscribe
  • Support Us

© 2026 Daily Tribune · tribune.net.ph · Powered by Quintype

NATION

Heavy rains damage Nanguneg West Bridge

Jasper Dawang·15 August 2026, 1:05 am·1 MIN READ

Heavy rains damage Nanguneg West Bridge

THE project contractor, in coordination with the DPWH Ilocos Sur 2nd District Engineering Office, has installed warning and precautionary signs and deployed the necessary equipment at the Nanguneg West Bridge in Narvacan, Ilocos Sur, to ensure the safety of motorists and the general public.

PHOTOGRAPH courtesy of DPWH Region 1-Ilocos/facebook

Text size

Share

Partner feature

Stay informed

Get Daily Tribune in your inbox

Breaking news, opinion, and business coverage for readers in the Philippines and abroad.

Subscribe to the newsletter

Read next

U.S. PUTS FILIPINO EYES AT SEA

U.S. PUTS FILIPINO EYES AT SEA

What's your take?

Share

Google Preferred Sources

Get more Daily Tribune stories in your search results

Add Daily Tribune as a preferred source on Google Search.

Add to Google

Continue reading

  • Cold war scales up
    Cold war scales up
  • PBBM admits public spending lagging by 7 percent
    PBBM admits public spending lagging by 7 percent
  • Marcos: No special ‘arrangement’ with China
    Marcos: No special ‘arrangement’ with China
Partner feature
Partner feature
Partner feature

Suggested Articles

Marcos’ EDSA project faces perfect storm
HEADLINES

Marcos’ EDSA project faces perfect storm

Bare ‘unseen hand’ behind contractor, gov’t dared

Raffy Ayeng·14 August 2026

Major Maysan Road overhaul starts — DPWH
METRO

Major Maysan Road overhaul starts — DPWH

The Department of Public Works and Highways (DPWH) will begin an P84-million rehabilitation of the heavily damaged…

Lisa Marie Apacible,Pat C. Santos·13 August 2026

New EDSA: Melts when wet
EDITORIAL

New EDSA: Melts when wet

So you get fantastic at living with bad roads. You hit the pothole once, you blame government. Twice, you remember it.…

DT·13 August 2026

Pothole-plagued Maysan Road set for six-month rehabilitation
NATION

Pothole-plagued Maysan Road set for six-month rehabilitation

The Department of Public Works and Highways (DPWH) will begin the rehabilitation of heavily damaged Maysan Road this…

Lisa Marie Apacible·13 August 2026

DPWH orders contractor to repair damaged Aringay flood control project
NATION

DPWH orders contractor to repair damaged Aringay flood control project

The Department of Public Works and Highways (DPWH) has ordered JWU Construction and Supply to repair portions of a…

Jasper Dawang·13 August 2026

  • DHSUD DPWH Infrastructure Push
  • Nangueg West Bridge collapse
  • Ilocos Sur flood control

NARVACAN, Ilocos Sur — Prolonged heavy rains, rising river levels and strong currents contributed to the collapse of a portion of the flood control structure at the ongoing Nangueg West Bridge project, according to sources within the Department of Public Works and Highways (DPWH).

The bridge remains under construction and had not yet been opened for regular use when the damage occurred.

DPWH sources said a temporary access road made of compacted earth beneath the bridge was being used by people and vehicles while construction continued.

Days of continuous heavy rainfall caused the river to rise and washed away about 20 meters of the temporary access road.

The washout altered the water flow, directing stronger currents toward the flood control structure. Instead of dispersing across a wider area, the water exerted greater hydraulic pressure on the affected section.

With heavy rains and strong currents persisting for several days, the structure was repeatedly exposed to the force of the rising river, eventually affecting the foundation and causing a portion of the slope protection or revetment structure to collapse, the sources said.

The DPWH sources cautioned against immediately attributing the incident to construction defects or poor workmanship. They said the project was being implemented according to approved plans and specifications, while construction materials had undergone required testing.

The contractor, Satrap Construction Co. Inc., also cited heavy rainfall and water conditions in a letter dated 10 August 2026, addressed to Ilocos Sur 2nd District Engineer Neil C. Farala through Project Engineer Janice C. del Rosario.

The letter covered Project 25APA0047, or the SIPAG project for the replacement of Nanguneg West Bridge in Narvacan, Ilocos Sur.

Satrap said its investigation found that the collapsed slope protection or revetment was critically damaged by strong water currents brought by heavy rains and Typhoon “Maymay.”

The contractor said continuous rainfall over several weeks caused the river level to rise, with the strong current and increased water level believed to have caused the affected portion to slip and collapse.

Satrap committed to undertaking repair and rectification works under its contractual obligations. The proposed measures include reconstructing the collapsed revetment and assessing the existing foundation to restore structural integrity and address forces that could affect adjacent structures.

The contractor also committed to documenting the remedial work through photographs.

The incident has raised questions about the condition of the structure, particularly since the bridge was still under construction.

Also read

Deadly habagat exposes Marcos’ Floodgate mess
HEADLINES

Deadly habagat exposes Marcos’ Floodgate mess

3 drown, including boy; 5 others killed

Jing Villamente,Lisa Marie Apacible,Jerod Orcullo,Sean A. Magbanua·10 August 2026

Also read

Heavy rains, altered water flow linked to collapse of Nangueg West Bridge structure
NATION

Heavy rains, altered water flow linked to collapse of Nangueg West Bridge structure

Prolonged heavy rains, rising river levels and strong currents contributed to the collapse of a portion of the flood control structure at…

Jasper Dawang·14 August 2026