Friday, 10 July 2026
Nasdaq +1.23%
Subscribe NowSupport Us

Daily TribuneDaily TribuneDaily Tribune

Daily TribuneDaily TribuneDaily Tribune
Subscribe
Friday, 10 July 2026
Nasdaq +1.23%
  • News
  • Commentary
  • Business
  • Life
  • Show
  • Sports
  • Global Goals
Partner feature
Daily TribuneDaily Tribune

The Philippines' leading digital newspaper.

News
  • Headlines
  • Page three
  • Metro
  • Nation
  • Dyaryo Tirada
  • Obituary (Remember Me)
Commentary
  • Columnists
  • Opinion
  • Editorial
  • Scuttlebutt
  • Letter to the Editor
Business
  • Shipping
  • Portraits
  • Pep
  • Business Advisories
  • Technology (Tech Talks)
Life
  • Show
  • Food & Drink
  • Getaways
  • Arts & Culture
  • Social Set
  • Spaces
  • Fashion & Beauty
  • The Edit
  • Top Form
  • Next Gen
  • Sacred Space
  • Project Larawan
  • Snaps
Sports
  • Hoops
  • Volley
  • Golf
  • Goal
  • Boxing
  • Tennis
  • Esports
  • Blast

Company

  • About
  • Contact
  • Advertise
  • Privacy
  • Subscribe
  • Support Us

© 2026 Daily Tribune · tribune.net.ph · Powered by Quintype

BUSINESS

Gov’t cuts red tape for home solar users

The JMC stated that if an LGU does not act within these periods, the application is considered approved, allowing applicants to move forward in the net-metering process based on proof of filing and payment.

Maria Bernadette Romero·2 February 2026, 12:06 am

Share

Gov’t cuts red tape for home solar users

SOLAR distributors install solar panels on the roof of a home in Metro Manila. The Department of Energy, the Department of the Interior and Local Government, the Department of Public Works and Highways, and some local government units released a Joint Memorandum Circular to allow Filipino households and businesses faster and easier access to solar power credits under the government’s Net-Metering Program.

Photograph courtesy of GoSolar Philippines

Partner feature

Filipino households and businesses can now expect faster and easier access to solar power credits under the government’s Net-Metering Program, following new rules cutting red tape and expanding consumer benefits.

On Sunday, the Department of Energy (DoE) said the nationwide participation in net-metering is expected to rise after the issuance of a Joint Memorandum Circular (JMC) that sets a fixed processing time for local permits, simplifies requirements for distribution utilities (DUs) under Energy Regulatory Commission (ERC) directives, and widens consumer participation through a DoE Supplemental Policy.

Under the JMC signed by the DoE, the Department of the Interior and Local Government (DILG), the Department of Public Works and Highways (DPWH), and local government units (LGUs) must use standardized application forms and meet strict deadlines.

LGUs are now required to issue electrical permits within three working days and Certificates of Final Electrical Inspection (CFEIs) within seven working days once complete documents are submitted.

The JMC was signed by Energy Secretary Sharon Garin, Interior and Local Government Secretary Juanito Victor Remulla, and Public Works and Highways Secretary Vivencio Dizon.

The JMC stated that if an LGU does not act within these periods, the application is considered approved, allowing applicants to move forward in the net-metering process based on proof of filing and payment.

For distribution utilities, the ERC, through its advisory issued on 22 September 2025, directed all grid-connected DUs to simplify and standardize documentary requirements for net-metering applications.

Applicants now only need to submit a duly accomplished application form with the required facility information, the LGU-issued CFEI, an amended net-metering agreement, and the applicable Certificate of Compliance (COC) application fee.

Notarization of the amended agreement is no longer required, and electronic signatures are allowed.

The DoE also issued a Supplemental Policy on 3 October 2025 to widen consumer benefits and participation.

Under this policy, qualified end-users retain ownership of Renewable Energy Certificates from the electricity they use, which can be sold or traded through the Renewable Energy Market, creating an additional source of income.

Qualified end-users may also share net-metering credits across multiple electricity accounts within the same DU franchise area through multi-site and aggregate net-metering.

“(We were called) to intensify, promote, and expedite the Net-Metering Program to empower Filipinos to generate clean energy and feed excess power to the grid,” Garin said.

“These coordinated measures, time-bound LGU processing under the JMC, streamlined DU requirements under ERC directives, and DoE’s Supplemental Policy that expands consumer benefits, remove bottlenecks and make net-metering faster, simpler, and more accessible to households and businesses,” she added.

Established under the Renewable Energy Act of 2008, the Net-Metering Program allows electricity users to install renewable energy systems, such as solar panels, and send excess power to the grid in exchange for credits that reduce future electricity bills.

As of December 2025, the Luzon grid recorded 17,141 qualified end-users with a total rated capacity of around 151 kilowatt-peak (kWp), accounting for 73.43 percent of the total.

The Visayas grid recorded 3,179 qualified end-users with a total rated capacity of around 44 kWp, or 21.21 percent, while the Mindanao grid recorded 904 qualified end-users with a total rated capacity of 11 kWp, or 5.36 percent.

Share

Google Preferred Sources

Get more Daily Tribune stories in your search results

Add Daily Tribune as a preferred source on Google Search.

Add to Google
Partner feature

Suggested Articles

Loans and money supply post 
faster growth
BUSINESS

Loans and money supply post faster growth

Bank lending and domestic liquidity (M3) both expanded at a faster pace in May, signaling sustained economic activity…

Toby Magsaysay·10 July 2026

BCDA lands in GOCC ‘Billionaires Club’ for P2.6-B BTr remittance
BUSINESS

BCDA lands in GOCC ‘Billionaires Club’ for P2.6-B BTr remittance

The Bases Conversion and Development Authority’s (BCDA) P2.6-billion remittance to the Bureau of Treasury (BTr) has…

Jonas Reyes·10 July 2026

Regional supply crunch drives June power prices up
BUSINESS

Regional supply crunch drives June power prices up

Electricity consumers could face higher power costs after wholesale electricity prices jumped in June as tighter…

Maria Bernadette Romero·10 July 2026

SM Prime opens P7-B Cebu arena
BUSINESS

SM Prime opens P7-B Cebu arena

SM Prime Holdings Inc. (SM Prime) is positioning Cebu as a bigger destination for business, tourism and live…

Maria Bernadette Romero·10 July 2026

Topline taps offshore infrastructure boom with new venture
BUSINESS

Topline taps offshore infrastructure boom with new venture

Topline Equity Corp. is expanding into offshore marine services through a new joint venture with Singapore-based Aesen…

Maria Bernadette Romero·10 July 2026

Basic Energy readies P1B capex for RE buildout
BUSINESS

Basic Energy readies P1B capex for RE buildout

Listed Basic Energy Corp. (BEC), led by businessman Ramon Villavicencio, is pouring nearly P1 billion into its…

Maria Bernadette Romero·10 July 2026