Panay needs more powerPanay needs at least 150 MW of additional baseload power capacity as electricity demand grows 10% to 12% annually, NGCP says.26 September 2026 · 2 MIN READ
Panay gets 775-MW power buildup through 2030The DoE is developing 775 MW of new generation capacity in Panay by 2030 and advancing an interconnection project to strengthen Western Visayas’ power supply.16 September 2026 · 2 MIN READ