Wednesday, 2 September 2026
Nasdaq -1.03%
Subscribe NowSupport Us

Daily Tribune

Daily Tribune
Subscribe
Wednesday, 2 September 2026
  • News
  • Opinion
  • Business
  • Life
  • Show
  • Sports
  • Global Goals
  • Obituary
Partner feature

The Philippines' leading digital newspaper.

News
  • Headlines
  • Page three
  • Metro
  • Nation
  • World
  • Dyaryo Tirada
  • SONATOTOO (archive)
Opinion
  • All columnists
  • Editorials
  • Guest essays
  • Letters to the Editor
  • Scuttlebutt
Business
  • Shipping
  • Portraits
  • Pep
  • Business Advisories
  • Technology (Tech Talks)
Life
  • Show
  • Food & Drink
  • Getaways
  • Arts & Culture
  • Social Set
  • Spaces
  • Fashion & Beauty
  • The Edit
  • Top Form
  • Next Gen
  • Sacred Space
  • Project Larawan
  • Snaps
Sports
  • Hoops
  • Volley
  • Golf
  • Goal
  • Boxing
  • Tennis
  • Esports
  • Blast

Company

  • SONATOTOO archive
  • About
  • Contact
  • Advertise
  • Privacy
  • Subscribe
  • Support Us

© 2026 Daily Tribune · tribune.net.ph · Powered by Quintype

NATION

NIA chief assures safety of aging dams, eyes multipurpose projects for flood control

Jasper Dawang·2 September 2026, 5:44 am·1 MIN READ

NIA chief assures safety of aging dams, eyes multipurpose projects for flood control
Text size
Partner feature

Stay informed

Get Daily Tribune in your inbox

Breaking news, opinion, and business coverage for readers in the Philippines and abroad.

Subscribe to the newsletter

Read next

Two dead, one missing after Grand Canyon flash flood

Two dead, one missing after Grand Canyon flash flood

What's your take?

Share

Google Preferred Sources

Get more Daily Tribune stories in your search results

Add Daily Tribune as a preferred source on Google Search.

Add to Google

Continue reading

  • DPWH eyes major Central Luzon detention basins
    DPWH eyes major Central Luzon detention basins
  • Castro pours cold water on Dizon’s toll holiday
    Castro pours cold water on Dizon’s toll holiday
  • Senate defunds new flood projects
    Senate defunds new flood projects
Partner feature
Partner feature
Partner feature

Suggested Articles

Recto: ‘I know nothing’ of bbm link to scam
NEWS

Recto: ‘I know nothing’ of bbm link to scam

Executive Secretary Ralph Recto said Tuesday he had “no personal knowledge” of the allegations linking President…

Jerod Orcullo·6 hours ago

Vice Ganda snubs Heart Evangelista
HEADLINES

Vice Ganda snubs Heart Evangelista

It was obvious that Vice Ganda purposely snubbed Heart Evangelista during the recent concert of Yeng Constantino. They…

Alex Brosas·6 hours ago

Romualdez camp: Recantations weaken case
HEADLINES

Romualdez camp: Recantations weaken case

The camp of former Speaker Martin Romualdez has challenged the claim of the Office of the Ombudsman that the…

Jerod Orcullo·6 hours ago

Nepal flood toll nears 1,000 as rescuers search for missing
WORLD

Nepal flood toll nears 1,000 as rescuers search for missing

The country has appealed for international aid, including ‘more than a thousand’ freezer units to store bodies.

Agence France-Presse·6 hours ago

NIA, Aparri officials forge partnership for EAAIS extension project
NATION

NIA, Aparri officials forge partnership for EAAIS extension project

The National Irrigation Administration (NIA) and local government officials of Aparri, Cagayan have strengthened their…

Jasper Dawang·27 August 2026

Share

  • The National Irrigation Administration (NIA) has assured the public of the structural integrity of its major dams, saying monitoring equipment has been installed to closely track the condition of structures that have been operating for more than five decades.

    NIA Administrator Engr. Eddie Guillen said there were no immediate structural concerns involving the agency's major high dams, many of which are earth-filled structures that become more compact over time.

    “Our dams are more than 50 years old. Lately, we installed equipment so we can monitor their integrity. It makes them even more secure,” Guillen said in an interview.

    He cited the Pantabangan and Magat dams, saying both still had substantial room before reaching their respective full levels during the period discussed.

    Pantabangan Dam needed more than 20 meters of additional water to reach its full level, while Magat Dam had more than 10 meters remaining before reaching capacity, according to Guillen.

    “Do not worry about our high dams. They are strong,” he said.

    Dams eyed for flood control, irrigation

    Guillen said dams could play a bigger role in addressing flooding and water management, particularly through multipurpose projects that combine flood control with irrigation.

    He said NIA is coordinating with the Department of Public Works and Highways (DPWH) under a convergence approach, where DPWH could fund and implement multipurpose infrastructure while NIA provides technical inputs and identifies potential sites.

    Under the proposed arrangement, NIA would help ensure that projects could also support irrigation and food production.

    Guillen said the government is considering diversion dams and similar structures that could slow water flow, reduce sedimentation and retain water for later use.

    He cited a newly completed DPWH project in Claveria, Cagayan, as an example of how such structures can influence water flow.

    “When you put something like that, it initially blocks the water and the velocity of the water really slows down because it drops,” Guillen said, adding that the structures could also help address sedimentation, which he described as a growing problem in the country's rivers.

    He said such projects could form part of immediate and long-term flood-control measures, particularly in Central Luzon, where major river systems carry large volumes of water during periods of intense rainfall.

    Pampanga River projects

    Guillen also pointed to proposed projects involving the Pampanga River system, including the planned Sumacbao Dam in General Tinio and the proposed Talavera Dam.

    The Sumacbao Dam is estimated to cost around P20 billion, while the Talavera project has an estimated cost of P6 billion, bringing the combined projected investment to about P26 billion.

    Guillen said the Talavera project already has a detailed engineering study and could help manage water flowing toward the Pampanga River.

    “The impact is significant because a large volume of water comes down to the Pampanga River,” he said.

    He said the proposed dams would help hold back excess water before it reaches downstream areas, reducing the volume entering the Pampanga River during heavy rainfall.

    Guillen cited Pantabangan Dam's operations during recent heavy rains as an example of how dams can help manage downstream flooding.

    Despite the heavy rainfall, Pantabangan Dam did not release water during the period in question, allowing it to retain inflows, he said.

    Guillen said the broader objective is not only to mitigate flooding but also to maximize stored water for irrigation and food production.

    “Once we are able to hold the water there, a significant benefit will come to us because it will not simply cause flooding downstream. As the President said, we can put the water to good use,” he said.

    NIA seeks higher 2027 budget

    Meanwhile, Guillen said NIA proposed a P135-billion budget for 2027 but was initially allocated about P46 billion under the government's budget proposal.

    He acknowledged that the proposed allocation is substantially lower than NIA's request but said the agency could seek additional funding for priority projects through Congress and the executive branch.

    “We are still being helped by Congress and the Senate so that it can increase, and the President as well,” Guillen said.

    He cited major irrigation and water-management projects such as Balog-Balog as examples of projects that could receive additional funding if prioritized by the government.

    Guillen said the proposed NIA-DPWH convergence could also help address funding constraints by allowing infrastructure projects to serve multiple purposes rather than being designed solely around a single agency's mandate.

    Under the arrangement, DPWH could provide funding and undertake construction, while NIA would help develop project plans and ensure that irrigation and water-management considerations are incorporated.

    Guillen said expanding the country's network of major dams remains a long-term goal, noting that the Philippines has 18 major river basins that could potentially benefit from more comprehensive water-management infrastructure.

    He said the effort is also aligned with President Ferdinand Marcos Jr.'s push to accelerate the development of water infrastructure capable of supporting both flood mitigation and agricultural production.

    • NIA
    • flood control project

    Also read

    Pampanga drowning; governor seeks help
    HEADLINES

    Pampanga drowning; governor seeks help

    314 barangays remain underwater, more than 1-M affected

    Raffy Ayeng·25 August 2026

    Also read

    NIA preps Pangasinan irrigation systems for storms
    NATION

    NIA preps Pangasinan irrigation systems for storms

    The National Irrigation Administration (NIA) Region 1 has stepped up preparations to protect irrigation systems and dams in Pangasinan as…

    Jasper Dawang·27 August 2026