Monday, 13 July 2026
Nasdaq +0.29%
Subscribe NowSupport Us

Daily TribuneDaily TribuneDaily Tribune

Daily TribuneDaily TribuneDaily Tribune
Subscribe
Monday, 13 July 2026
Nasdaq +0.29%
  • News
  • Commentary
  • Business
  • Life
  • Show
  • Sports
  • Global Goals
Partner feature
Daily TribuneDaily Tribune

The Philippines' leading digital newspaper.

News
  • Headlines
  • Page three
  • Metro
  • Nation
  • World
  • Dyaryo Tirada
  • Obituary (Remember Me)
Commentary
  • Columnists
  • Opinion
  • Editorial
  • Scuttlebutt
  • Letter to the Editor
Business
  • Shipping
  • Portraits
  • Pep
  • Business Advisories
  • Technology (Tech Talks)
Life
  • Show
  • Food & Drink
  • Getaways
  • Arts & Culture
  • Social Set
  • Spaces
  • Fashion & Beauty
  • The Edit
  • Top Form
  • Next Gen
  • Sacred Space
  • Project Larawan
  • Snaps
Sports
  • Hoops
  • Volley
  • Golf
  • Goal
  • Boxing
  • Tennis
  • Esports
  • Blast

Company

  • About
  • Contact
  • Advertise
  • Privacy
  • Subscribe
  • Support Us

© 2026 Daily Tribune · tribune.net.ph · Powered by Quintype

NATION

Marcos OKs North-South railway project

RQ

Richbon Quevedo·16 July 2025, 10:11 pm

Text size

Share

Marcos OKs North-South railway project

The Economic Development Council chaired by President Ferdinand Marcos Jr. has approved the public-private partnership of the operations and maintenance project of the North-South Commuter Railway (NSCR).

Presidential Communications Office

Partner feature

Share

Google Preferred Sources

Get more Daily Tribune stories in your search results

Add Daily Tribune as a preferred source on Google Search.

Add to Google
Partner feature
Partner feature

President Ferdinand Marcos Jr. has approved the public-private partnership for the operations and maintenance project of the North-South Commuter Railway (NSCR).

The NSCR is a 147.26-kilometer elevated railway line that will connect Pampanga to Laguna, opening up access across Central Luzon, Metro Manila, and the CALABARZON region.

With the PPP, the rail system is guaranteed to have efficient, reliable, and sustainable operations once operational.

After construction is finished, the new railway system will feature 35 stations. Among them are 31 elevated stations, 3 at-grade stations, and one underground station. It will have depots located in strategic locations: Clark, Pampanga in Central Luzon; Valenzuela City in Metro Manila; and Calamba City in Southern Luzon.

In its full capacity operation, the NSCR is expected to service 800,000 passengers daily at first, gradually increasing to accommodate one million passengers per day.

Meanwhile, there will be two types of services that will operate on the line. First is the commuter service, which can accommodate up to more than 2,200 passengers in its 51 trainsets.

Second is the "Limited Express" service, which will operate with seven trainsets, with a capacity of transporting around 400 passengers.

To ensure a fast and reliable service, trains will operate at high speeds ranging from 120 to 130 kilometers per hour—a significant boost in travel speed compared to the current average of 20 to 40 kilometers per hour.

Estimated travel time from Clark to Calamba is expected to be around three hours.

On the other hand, the Limited Express will reduce Clark-to-Alabang trips to about two hours. Minimum train headway is estimated to be three minutes.

In addition, the NSCR system will also be integrated with the Metro Manila Subway Project (MMSP), particularly in the FTI to Bicutan segment.

Pre-operations are scheduled to begin in March 2026, with full operations targeted for January 2032.

The total cost of the project is estimated to reach P229.32 billion.

Suggested Articles

CCC, Germany boost climate action
NATION

CCC, Germany boost climate action

The Climate Change Commission (CCC) and the Federal Republic of Germany are stepping up efforts to strengthen climate…

DT·13 July 2026

Businessman named OPAV chief
NATION

Businessman named OPAV chief

President Ferdinand Marcos Jr. has appointed prominent Cebu businessman Philip Lo as secretary of the Office of the…

Rico Osmeña·13 July 2026

1,200 students get aid
NATION

1,200 students get aid

A total of 1,200 college students from Pangasinan's Fourth District received P5,000 each in educational assistance…

Jasper Dawang·13 July 2026

PNP general ends storied career
NATION

PNP general ends storied career

Police Brigadier General Hansel M. Marantan retired from the Philippine National Police on 10 July upon reaching the…

Jasper Dawang·13 July 2026

DoH expands specialty centers
NATION

DoH expands specialty centers

The Department of Health (DoH) is accelerating the expansion of specialty centers nationwide to ensure Filipinos can…

Alvin Murcia·13 July 2026

Stakeholders pledge to protect SINP
NATION

Stakeholders pledge to protect SINP

TACLOBAN CITY — Stakeholders have pledged to protect the environment and biodiversity of the Samar Island Natural Park…

Elmer Recuerdo·13 July 2026