Skip to content

Topic

DPWH asphalt overlay and concrete reblocking

Latest Daily Tribune news and analysis on DPWH asphalt overlay and concrete reblocking.

  1. DPWH resumes EDSA Phase 2 reblocking

    DPWH resumes EDSA Phase 2 reblocking

    The DPWH has resumed the second phase of EDSA rehabilitation, with asphalt overlay and concrete reblocking scheduled through 8 November along sections near…