New Nueva Ecija water pond seen
The project will provide protection from flood risks and will also be beneficial to the agricultural sector as it is expected to provide ample water supply to irrigate farmlands
The project will provide protection from flood risks and will also be beneficial to the agricultural sector as it is expected to provide ample water supply to irrigate farmlands

The so-called “Oplan Romanov,” or the alleged covert operation purportedly aimed at eliminating Vice President Sara…

TACLOBAN CITY — Just a week after classes resumed following a fatal mass shooting on campus, officials at San Jose…

The Philippine Charity Sweepstakes Office (PCSO) has signed up another corporation to expand public access to the…

Water reserves at Pantabangan Dam are rising steadily following heavy rains brought by the southwest monsoon and…

Bureau of Customs (BoC) personnel at the Port of Clark have intercepted four shipments containing marijuana resin and…

DPWH NUEVA ECIJA 1ST DEO DPAIU
Read next

What's your take?
Google Preferred Sources
Get more Daily Tribune stories in your search results
Add Daily Tribune as a preferred source on Google Search.
Continue reading
CUYAPO, Nueva Ecija — The Department of Public Works and Highways announced that it is currently constructing a small water impoundment and rehabilitating a natural pond in this town in a bid to improve access to water while lessening flooding.
Nueva Ecija 1st District Engineering Office District Engineer Armando Manabat disclosed that the implemented the P9.8-million Small Water Impounding Project is a concrete structure under construction in Sitio Tabon, with completion rate at 93.7 percent.
He added that the SWIP is near a natural pond located at the foot of a high terrain.
"Once completed, this structure will efficiently store rainfall and run-off during the rainy season, thus preventing water overflow into nearby residential and agricultural communities," Manabat said.
The agency is also excavating the shallow and uneven sections of the natural pond to deepen it by 2 to 2.4 meters, adding that as of 15 September 2022, the project with a planned physical target of 42,436 cubic meters of soil excavation is expected to be 90 percent complete.
Manabat said that the project will provide protection from flood risks and will also be beneficial to the agricultural sector as it is expected to provide ample water supply to irrigate farmlands not only in the said barangay but also in neighboring villages.
Meantime, Barangay Bambanaba OIC-Captain Rodrigo Casiera said that the natural pond serves as a water retention basin and by deepening its beds, its storage capacity increases so it can accumulate more water run-off that comes from high places.
He added that residents often get the water they use for their daily activities in the reservoir, while farmers also benefit from this water source especially during dry season mainly for irrigating their crops.
The DPWH said that both projects are expected to be completed before the end of the year.