Daily Tribune

NATION

Meralco readies crews for habagat outages

DT · Aug 31, 2026, 11:36 AM

On alert 24/7 Meralco crews continue to work nonstop to ensure normal power service for customers despite heavy rains triggered by the enhanced southwest monsoon (habagat). Seen in the photo are Meralco crews conducting power restoration works in Meycauayan, Bulacan.

The Manila Electric Co. said Saturday its crews are prepared to respond to power outages and other service concerns that may result from heavy rains brought by the southwest monsoon.

Meralco Vice President and Head of Corporate Communications Joe R. Zaldarriaga said the company is monitoring weather conditions and has deployed measures to address possible disruptions.

“We are continuously monitoring the situation and our crews are ready to attend to any possible electricity service concern in areas that might be affected by the inclement weather,” Zaldarriaga said.

Meralco also urged billboard owners to temporarily roll up their billboards to reduce the risk of structures being toppled by strong winds.

The utility advised residents in flooded areas to stay away from downed power lines and submerged electrical facilities, turn off their main power switch if safe to do so, and avoid using flood-damaged appliances.

Customers were also advised to ensure electrical equipment and wiring are completely dry and inspected by a licensed electrician before use.