Analy Labor
SNAPS

Men at work

LOOK: Workers were busy building a concrete post of Metro Rail Transit (MRT-7) along Quirino Highway near San Jose del Monte, Bulacan, on Saturday, 2 March 2024. The MRT-7 is almost two-thirds complete and is on track to be fully operational by November 2025.

Author : Analy Labor